Our professionals have gained our design-build experience during the I-12 Widening (O’Neal Lane to Walker) project and as part of the LTM Joint Venture on the John James Audubon Bridge.
Most recently we have provided Owner Verification and Quality Assurance along with administration of two Design-Build Projects on US 90. We now have several engineers and inspectors with vast experience on DB projects.