Woodlake Bridge Over Jones Creek

Client: LADOTD

Areas of Expertise: Construction Engineering Support

This project consisted of the construction of an off-system bridge in East Baton Rouge Parish, including the approaching roadways.

As the Prime, GEC provided all construction inspection services required for:

  • the removal of two existing slab spans
  • bridge with timber pilings and bents
  • installation of two cast-in-place bridges and associated embankment
  • grading
  • Portland Cement concrete surfacing
  • approach slabs
  • asphaltic concrete pavement along with sidewalks

Construction Inspection and Project Documentation for this project was performed in accordance with LADOTD’s Standards and Procedures.

Firm Members Involved: Jason Corkern, Brian Buckel